XcellComply|SOC 1 Consulting

Controls your clients' auditors can rely on.

We get your service organisation ready for a SOC 1 report under SSAE 18 or ISAE 3402 — control objectives, system description, evidence and auditor coordination. The opinion itself comes from an independent CPA firm we coordinate.

Control objectives for your processes
System description drafted
ITGCs: access, change, operations
Evidence calendar for the window
Mock testing before fieldwork
CPA firm coordination
SSAE 18 / ISAE 3402ICFR · service organisations
Type II · 6-month windowoperating effectiveness
XcellComply · controls ledgerWindow opens
Transaction sample dataApprovedMatchedSoDEvidence
Observation window · Type IImonth 0 of 6
AprMayJunJulAugSep
0transactions
0evidence items
0exceptions
SOC 1 Type II reportwindow open · opinion pendingUnqualified opinion
Delivered byXXcellHost GRCISO 27001 · SOC 2 certified MSP
Readiness from ₹3,99,999SSAE 18 · ISAE 3402Type I & Type II6–12 month windowsOpinion by an independent CPA firmGST invoice in INR
Overview

One report your clients' auditors rely on — instead of auditing you one by one.

A SOC 1 report covers controls at a service organisation that matter to its clients' internal control over financial reporting (ICFR). If you run payroll, process claims, service loans, reconcile accounts or host billing for other companies, their external auditors need comfort that your part of the chain works. A SOC 1 gives it to them once, in a standard form. It is performed under SSAE 18 (AICPA, US) or ISAE 3402 (IAASB, international); ICAI's SAE 3402 is the Indian equivalent. A Type I covers design at a point in time; a Type II also tests operating effectiveness over a period, usually 6–12 months.

You define the control objectives, describe the system and run the controls. An independent CPA firm examines them and issues the opinion — XcellHost never does. Our job is everything before and around that: scoping, control design, the system description, IT general controls, complementary user entity controls (CUECs), evidence, mock testing and coordinating the auditor. We hold SOC 2 Type I & II and ISO 27001 for our own 24×7 operations in Mumbai, so we know what an attestation season feels like from the inside.

Recognised by / aligned with AICPA · SSAE 18 IAASB · ISAE 3402 ICAI · SAE 3402 SOX 404 clients RBI SEBI IRDAI CERT-In DPDP Act
How we work

Assess, implement, attest — with a dated plan from week one.

Every engagement runs the same three phases. Finance, operations and IT sit in the same workshops, because a SOC 1 tests both business-process controls and the IT controls underneath them.

01 · Assess

Scope & readiness

We map which services and processes affect your clients' financial statements, walk through each one and score the controls you already have.

  • In-scope services, locations and systems
  • Subservice organisations: carve-out or inclusive
  • Readiness report with a gap list
02 · Implement

Control design & evidence

We write the control objectives and controls with you, close the gaps, draft the system description and set up an evidence calendar people actually follow.

  • Risk & control matrix (RCM)
  • ITGC policies and procedures
  • CUECs and system description draft
03 · Attest

Mock test, then the auditor

We sample your evidence the way the CPA firm will, fix what fails, then coordinate fieldwork, requests and management responses until the report is issued.

  • Mock tests on real samples
  • PBC list and walkthrough support
  • Management assertion & exception responses
SOC 1, SOC 2 or SOC 3 · Type I or Type II

SOC 1 is about the numbers. Type II is what most auditors want.

If your clients' auditors are asking, you need a SOC 1. If their security teams are asking, you probably need a SOC 2. Many service organisations end up with both.

Swipe the table to compare

 SOC 1SOC 2SOC 3
Question it answersCan your clients rely on your controls for their financial reporting?Are your systems secure, available and private enough to trust?Same as SOC 2, in a short public summary
StandardSSAE 18 (AT-C 320) · ISAE 3402 · ICAI SAE 3402SSAE 18 · AICPA Trust Services CriteriaSSAE 18 · Trust Services Criteria
Controls testedControl objectives you define, plus IT general controlsFixed criteria: Security plus optional categoriesFixed criteria, no test detail
Who reads itClients' management, controllers and external auditorsClients' security, risk and procurement teamsAnyone — often posted on a website
DistributionRestricted to clients and their auditorsRestricted, usually under NDAGeneral use
TypesType I and Type IIType I and Type IIType II only
Need SOC 2 as well?Most evidence is shared — see SOC 2 readiness →
Type IDesign, at a date

The CPA firm checks that your system description is fair and your controls are suitably designed and in place on one date. Faster and cheaper — a common first report.

  • Ready about 3–5 months after kick-off
  • No testing of how controls ran over time
Type IIDesign and operation, over a period

Everything in a Type I, plus the auditor samples evidence across a 6–12 month window to test that each control actually operated. This is what most user auditors ask for.

  • Renewed every year to keep coverage continuous
  • Gaps to a client's year-end covered by a bridge letter
Inside a SOC 1 report

Five sections. You write three of them.

The CPA firm writes the opinion and the tests. Management owns the assertion, the system description and the control objectives — and that's where most of the work, and most of our help, goes.

Shared responsibility

Your controls, your clients' controls — and your vendors' in between.

No service organisation controls everything. A SOC 1 says exactly which controls your clients must run (CUECs) and how your own vendors — the cloud host, the data centre, a tax engine — are treated.

How is your subservice organisation handled?
User entityYour client

Relies on your report for its own financial statements.

CUECs — your client runs
  • Approves payroll inputs before cut-off
  • Tells you about leavers on time
  • Restricts its own users' access to your portal
  • Reviews the reports you send back
Service organisationYou

Defines control objectives, runs the controls, signs the assertion.

In your report · tested
  • Business-process controls
  • Access, change & operations ITGCs
  • Vendor's data-centre controls
Subservice organisationYour vendor

Its controls are excluded from your report and listed as CSOCs.

CSOCs — vendor runs, outside your report
  • Physical access to the data centre
  • Power, cooling & hardware upkeep
  • Its own infrastructure changes
Control objective builder

Pick your processes. Get a starting control matrix.

Choose what you do for clients. We suggest control objectives and example controls — type, frequency and the evidence an auditor will sample — and you can download the lot as a matrix skeleton.

Start from a typical service organisation
Business processes you run for clients
IT general controls underneath every process

Suggestions are a starting point, written in plain English. Your final control objectives are yours to define and your CPA firm will agree they're reasonable before fieldwork.

0control objectives
0example controls
0samples · Type II
Control mix
AutomatedManualIT-dependent manual

Sample counts follow common audit practice for a 6-month window (e.g. 25 for daily controls, 2 for quarterly). Your CPA firm sets the real sample sizes.

Type I vs Type II planner

When will you have a report in your client's hands?

Pick a report type, where you're starting from and when you can kick off. We lay out the readiness work, the observation window, the CPA firm's fieldwork and any bridge letter to your clients' year-end.

Report
Where you are today
Observation window
Your clients' year-end
Report in hand—
Period covered—
Bridge letter—
XcellHost with your teamObservation windowCPA firmBridge letter

Planning estimate. CPA-firm availability, sample requests and exceptions can move dates; reports are typically issued 4–8 weeks after the period ends.

Deliverables

What you keep — editable, versioned and ready for next year.

Everything is yours in Word, Excel or the compliance platform you already use. Year two starts from these, not from a blank page.

ScopeScoping memo

In-scope services, clients, locations, systems and the financial assertions they touch.

RCMRisk & control matrix

Control objectives, controls, owners, frequency, type and key evidence in one sheet.

Sec. 3System description

Services, transaction flows, ITGCs and changes in the period — drafted with you.

CUECCUEC & CSOC list

What your clients and your vendors must do for your controls to work.

FlowsWalkthrough narratives

Process flowcharts and narratives the auditor can follow without a meeting.

ITGCITGC policies

Access, change, job scheduling and backup procedures that match how you work.

GapsReadiness report

Control-by-control gaps, owners and dates — tracked to closure.

PBCEvidence calendar & PBC list

Who saves which evidence, when — plus the auditor's "provided by client" list.

MockMock test results

Our own samples, tested the auditor's way, with fixes before fieldwork.

Sec. 2Management assertion

Draft assertion for your leadership to review and sign.

Sec. 5Exception responses

Clear, factual management responses for any exceptions the auditor notes.

BridgeBridge letter template

Covers the gap between your report period and your clients' year-end.

Timeline

From kick-off to a Type I report in 18 weeks.

Phases overlap so nobody waits. Pick a package to see its typical plan; the real one is fixed after the readiness assessment.

Week1Kick-off & scoping
XcellHost with your teamObservation windowIndependent CPA firmCPA-firm scheduling can add a few weeks; book them early.
Packages & pricing

Three fixed-fee packages — priced in rupees, not hours.

Each package is a fixed consulting fee for our work. The CPA firm's examination fee is separate and paid to the CPA firm. All prices are indicative and exclude 18% GST.

FIXED-FEE PROJECT
XXcellComply
XcellComply · SOC 1 Consulting

Readiness + Type I

up to 3 processes · SSAE 18 / ISAE 3402
Typical duration~18 weeks
Report supportType I
Starting from₹3,99,999
one-time project fee
Project₹5,99,999 one-time
Year 2+₹6,99,999 / year · optional
CPA-firm examination feePaid to the firm
Configure & Buy →
Indicative · excl. 18% GST

Choose a package

₹49,999Each extra in-scope process
₹74,999Each extra quarter of window
₹29,999Bridge letters & auditor queries · yr
₹6,99,999Annual Type II renewal · per year
Every package includes
Scoping & walkthroughsControl objectives & RCMGap remediation planSystem descriptionCUEC listCPA firm introductions

Prices are indicative placeholders until confirmed on your quotation. CPA-firm fees, travel outside Mumbai and tooling licences are not included.

Package Readiness + Type I
Payroll, AP, billing, reconciliations… ITGCs are always included.
Observation window Type II only
Your estimate
₹0
project fee, excl. GST
Readiness + Type I₹0
Extra processes · none₹0
Extended window · none₹0
Bridge-letter support · not added₹0
GST (18%)₹0
Payable incl. GST₹0
Each package · for your scopeexcl. GST
Indicative · excl. 18% GST. 40% on kick-off, 40% at readiness sign-off, 20% on report issue. CPA-firm examination fees are paid directly to the CPA firm.
Why XcellHost

We prepare you for an attestation we go through ourselves.

XcellHost holds SOC 2 Type I & II and ISO 27001, 27017, 27018, 20000-1 and 9001 for its own cloud and NOC operations. That experience is what you're buying.

We live with auditors

Our own SOC 2 and ISO audits run every year. We know what evidence gets sampled, and why it gets rejected.

01
Finance and IT in one team

Business-process controls and ITGCs are designed together, so automated controls hold up when the auditor tests them.

02
Independent by design

We never issue the opinion. We coordinate with licensed CPA firms and can introduce partners for you to get quotes from.

03
Fixed fee, GST invoice

One project price in rupees with milestone billing — no hourly meter while you look for evidence.

04
India delivery, global clients

We work Mumbai hours with overlap for US and UK client calls and auditor walkthroughs.

05
After the report

Bridge letters, client auditor questions, year-two renewal and changes to scope — handled by the same team.

06
Who needs SOC 1 in India

Built for Indian teams that run someone else's numbers.

India is where a large share of the world's payroll, finance operations and back-office processing happens. When those clients are audited, their auditors come looking for your controls.

Payroll & HR outsourcing

Salary, statutory deductions and payouts for client employees feed straight into their books.

PayrollPF · ESI · TDS

F&A BPOs & KPOs

Procure-to-pay, order-to-cash and record-to-report delivered for US, UK and EU clients.

P2PO2CR2R

Fintech & NBFC back-offices

Loan servicing, collections and reconciliations for lenders and co-lending partners.

Loan servicingCo-lending

Insurance TPAs & claims

Claims adjudication and payments on behalf of insurers that must report them accurately.

ClaimsIRDAI

SaaS with financial data

Billing, ERP, expense and payments platforms whose output lands in clients' ledgers.

BillingERPPayments

GCCs & captives

Indian centres of global groups supporting the parent's SOX 404 controls over financial reporting.

SOX 404Group finance
US clients · SOX 404

Your client's auditor relies on you

US-listed clients must assess their ICFR every year. A SOC 1 Type II covering their fiscal year is the usual way their auditor gets comfort over what you process.

ReportSSAE 18Type II
ICAI · SAE 3402

Indian and international standards

SSAE 18 is the US standard, ISAE 3402 its international counterpart and ICAI's SAE 3402 the Indian one. One set of controls can usually support any of them.

ReportISAE 3402SAE 3402
RBI · SEBI · IRDAI

Regulated clients audit their vendors

RBI's IT-outsourcing directions and sector guidelines expect regulated entities to assess and audit service providers. An independent assurance report answers much of it.

Helps withVendor auditsOutsourcing

Not legal or accounting advice. Which report your clients accept, and the period it must cover, is their auditor's call — we help you confirm it early.

Frequently Asked Questions

No. A SOC 1 opinion can only be issued by an independent, licensed CPA firm (or, for ISAE 3402 and SAE 3402 engagements, a qualified independent assurance practitioner). XcellHost prepares you, coordinates the examination and can introduce firms for you to get quotes from. Their fees are separate and paid to them directly.

SOC 1 covers controls relevant to your clients' financial reporting, against control objectives you define. SOC 2 covers security, availability, processing integrity, confidentiality and privacy against fixed AICPA criteria. Payroll, F&A and loan-servicing providers usually need SOC 1; SaaS and hosting providers are usually asked for SOC 2. Some need both, and much of the IT evidence is shared.

If a client needs something soon, or your controls are new, a Type I gives an early report while the Type II window runs. If your controls have been operating for a while and your clients' auditors want operating effectiveness, going straight to a Type II saves a cycle. The planner above shows both paths.

Usually 6 to 12 months. A first Type II is often 6 months; after that most organisations move to a 12-month window renewed every year so coverage is continuous. The window should be agreed with your CPA firm and ideally overlap most of your clients' fiscal years.

You do — that's a key difference from SOC 2. Objectives should address the risks that matter to your clients' financial statements, such as transactions being authorised, complete, accurate and processed on time. We draft them with you, and your CPA firm checks they're reasonable before testing starts.

Controls your clients must perform for your controls to achieve their objectives — for example approving payroll inputs, telling you about leavers or reviewing the reports you send back. They are listed in your system description so each client's auditor knows what to test on their side.

A short letter from your management, not the CPA firm, stating that there have been no material changes to the controls between the end of your report period and a later date — often your client's year-end. It covers short gaps; long gaps are better solved by moving your window.

Exceptions are reported in Section 4 with the test results, and you can add a management response. One exception does not automatically mean a qualified opinion; that depends on whether the control objective was still achieved. Mock testing before fieldwork is how we keep exceptions rare and explainable.

They are subservice organisations. Most reports use the carve-out method: their controls are excluded, described as complementary subservice organisation controls (CSOCs), and you monitor them — often by reviewing their own SOC reports. The inclusive method tests them inside your report, which needs their cooperation and an assertion from them.

Plan for one internal owner at about a day a week, plus short sessions with process leads, IT and leadership. We write the documents and run the mock tests; your teams operate the controls and keep the evidence.

No. Many SOC 1 programmes run well on a tidy evidence folder and a shared calendar. If you already use one of the popular compliance automation platforms, we work inside it. We're platform-agnostic and don't resell tooling in these packages.

No. They are indicative and exclude 18% GST. Your fixed fee is confirmed after a short scoping call and appears on your XcellHost quotation. CPA-firm fees and travel outside Mumbai are quoted separately.

Tell us what you run for clients. We'll send a fixed-fee SOC 1 plan.

A 30-minute call is enough to scope processes, systems and timing. You get a dated plan, a quote in rupees and introductions to independent CPA firms.

XCELLCOMPLY
BY XCELLHOST
ISO 9001 · 27001 · 27017 · 27018 · 20000-1SOC 2 Type I & IIMeitY empanelled24×7 NOC & SOCSince 1999