Overview · on-premises data-centre build

Your room, your hall, your site. Built and handed over as one project.

Some workloads have to stay on your premises: plant systems, latency-sensitive branches, regulated records, or GPU clusters you want next to your data. Building the room for them pulls in civil works, electrical, mechanical, fire, security, cabling and monitoring, usually from different contractors. XcellHost Data Center Build Services runs all of it as a single programme, from the first site survey to the day our NOC starts watching your alarms.

We size the facility from your racks and kW, set a design intent against Tier topology concepts and TIA-942 ratings, specify equipment OEM-agnostically, manage the build, and commission every system from factory tests through integrated systems testing. You get as-built drawings, test records and an operating manual. Then we can run it for you under AMC with 24×7 monitoring from Mumbai. Estimate costs first, or compare with colocation in our Tier IV data centre.

S

Server room

1–4 racks in an office or plant. Precision cooling, UPS, clean-agent fire and access control.

typically up to ~20 kW IT*
E

Edge & micro DC

Self-contained racks or enclosures at branches, towers, retail and factories, monitored remotely.

1–10 racks · remote sites*
M

Modular / containerised

Prefabricated power, cooling and IT modules shipped to site and added as you grow.

phased capacity*
D

Enterprise data centre

Dedicated halls with redundant power and cooling paths, NOC, staging and secure perimeter.

tens to hundreds of racks*
AI

AI-ready hall

High-density GPU rows with liquid-ready cooling, heavier floors and bigger power blocks.

Liquid-cooled AI →
One programme covers Survey Design Power Cooling Fire Security Commissioning NOC
Scope · twelve disciplines

Everything a data hall needs. Pick a discipline to see what we deliver.

Each discipline is designed against your load, redundancy target and site. Equipment is specified OEM-agnostically and confirmed at proposal.

Power path · one-line view

Two paths to every rack. Watch the load ride through a utility failure.

Illustration of a typical dual-path (A + B) design. Your topology is set by the redundancy target you choose.

UTILITYHT feed · live DG SETstandby TX · LT · ATSon utility UPS Aonline UPS Bonline PDU / BUSWAY Ametered PDU / BUSWAY Bmetered RACKSdual-cordedload: on battery 100% NORMAL · UTILITY
  • Utility & transformerHT supply, transformer, LT panel and earthing sized to facility load × margin.
  • DG & ATSDiesel generator with automatic transfer; fuel autonomy set to your grid reliability and approvals.
  • UPS A + BOnline double-conversion UPS with battery runtime to bridge generator start.
  • PDU & buswayMetered or monitored distribution to dual-corded racks, one cord per path.
Process · six gated phases

Each phase ends with a gate. Nothing moves on until it passes.

  1. 01Assess

    Site survey, utility and structural checks, risk review, requirement brief.

    Gate · feasibility report
  2. 02Design

    Concept to detailed design: layouts, one-lines, cooling, fire, BoQ.

    Gate · design freeze
  3. 03Procure

    OEM-agnostic specs, vendor comparison, factory witness tests (L1).

    Gate · equipment on site
  4. 04Build

    Civil, electrical, mechanical, fire, security and cabling works, QA daily.

    Gate · mechanical completion
  5. 05Commission

    L2–L5: inspection, start-up, functional tests, integrated systems test.

    Gate · IST sign-off
  6. 06Handover & run

    As-builts, O&M manuals, training, AMC and 24×7 NOC onboarding.

    Gate · live in NOC
How XcellHost delivers

Designed around your load. Run by people who operate data centres.

XcellHost has operated infrastructure for Indian businesses since 1999 and runs its own Tier IV data centre in Mumbai. That operating view shapes every build.

One accountable lead

A single XcellHost project manager owns scope, programme, risk and every contractor interface.

01
OEM-agnostic specification

We specify by performance, compare equivalent equipment from leading OEMs and recommend on fit and lifecycle cost.

02
Documented to the last cable

Drawings, BoQ, test scripts, snag lists, as-builts and O&M manuals handed over in one pack.

03
Commissioned, not just installed

L1 factory tests through L5 integrated systems testing, with load banks and failure simulations.

04
INR quotes with GST

Phase-wise, itemised quotations in INR with GST invoices and milestone billing.

05
24×7 NOC from Mumbai

After handover, DCIM and BMS alarms route to our NOC, with AMC visits and escalation.

06

OEM-agnostic. We work with equipment from leading power, cooling, rack, fire and security manufacturers and choose per project. No equipment brand is fixed in advance, and XcellHost holds no exclusive OEM tie that would bias the choice.

Built for India

Regulation, climate and grid. Designed in from day one.

A data hall in India has to cope with monsoon, high ambient heat, variable grid supply and local approvals, as well as data rules. The design helps you meet them. It does not replace your own compliance work.

DPDP Act 2023

Access control, CCTV, visitor logs and media handling support the reasonable security safeguards the Act expects for personal data.

CERT-In directions (2022)

Time sync, log capture and 24×7 monitoring designed in, helping you meet 6-hour incident reporting and 180-day log retention.

MeitY & government workloads

Facility controls and documentation prepared for the audits that government and public-sector hosting asks for.

RBI / SEBI data localisation

Keeping payment and market data on infrastructure you control in India, with the physical controls your regulator's audit will check.

India design checks
  • 45 °C+ ambientHeat-rejection plant sized for Indian summer peaks*
  • Monsoon & floodingPlinth level, drainage and leak detection reviewed at survey
  • Grid qualityDG autonomy and fuel storage set to your supply history
  • Local approvalsFire NOC, electrical inspectorate and DG permissions tracked as gates

*Design standards & certifications confirmed at proposal.

Plans · start small, commit per phase

Two fixed-price starts. The build is quoted to your design.

Indicative · excl. 18% GST. Fixed-price packages are per site. Build, commissioning and operations are quoted once the design is frozen.

Phase 1

Site survey & feasibility

₹49,999per site · one-time*
  • On-site survey of space, structure and access
  • Utility capacity and DG feasibility check
  • Risk review: flood, heat, fire, security
  • Feasibility report with sizing and options
Most chosen first step Phase 2

Design package

₹2,49,999per site · one-time*
  • Layouts, rack elevations, containment
  • Power one-lines, UPS, DG, PDU sizing
  • Cooling, fire, security and cabling design
  • BoQ and OEM-agnostic specifications
Phase 3–5

Build & commission

On quoteto your frozen design
  • Procurement and factory witness tests
  • Civil, electrical and mechanical works
  • Commissioning L1–L5 with load banks
  • As-builts and test records
Phase 6

AMC & 24×7 NOC

On quotemonthly or annual
  • DCIM/BMS alarms to the Mumbai NOC
  • Planned preventive maintenance visits
  • Escalation and OEM coordination
  • Monthly capacity and PUE report
Configure your project

Choose the scope. Get a quotation summary.

Fixed-price phases go to the cart. Everything else lands on your quotation request with the sizing filled in.

1Facility type
2Size & target
Design intent (Tier concept)*
Design intent only. Formal Tier or TIA-942 certification is a separate third-party process. *Design standards & certifications confirmed at proposal.
3Scope
Quotation request

Send us your scope.

Your configuration is filled in below. Add the site address, drawings you have and your target date, and our infrastructure team replies within one business day.

  • Phase-wise INR quotation with GST
  • Survey slot at your site
  • One named project lead
Enter your name
Enter your company
Enter a valid email
Enter a phone number
Enter the site location
Tool 1 · DC build sizing estimator

Racks × kW in. IT load, cooling, UPS and DG out.

The same rules of thumb as our cost calculator, plus the redundancy you design for. Illustrative engineering estimate, not a design.

Redundancy for UPS, cooling & DG
Formulas (shared with the cost calculator)
IT kW        = racks × kW per rack × (1 + headroom)
Facility kW  = IT kW × PUE
Cooling kW   = IT kW × 1.1        TR = cooling kW ÷ 3.517
UPS kVA      = IT kW ÷ 0.9 PF × 1.25 headroom   (per path)
DG kVA       = facility kW ÷ 0.8 PF × 1.25 margin
Installed    = design capacity × redundancy (N 1 · N+1 1.5 · 2N 2)
Area         = racks × sq ft per rack
Capex*       = IT kW × ₹ per kW  (illustrative, excl. land)
IT load120 kW0.12 MW
Facility load180 kWIT × PUE
Cooling132 kW37.5 TR · design
UPS167 kVAper path
Diesel generator281 kVAdesign
White space1,200 sq ft111.5 m²
Illustrative build capex*₹0excl. land · your contractor's rate replaces it
Estimate costs
Cooling & containment

Keep cold air and hot air apart. Contain the aisle, and the cooling works less hard.

Supply air24 °C
Return air36 °C
Mixinglow

Doors and roof panels close off the cold aisle, so servers breathe only supply air and hot exhaust goes straight back to the cooling units.

Illustrative temperatures. Design set-points follow your equipment's allowable inlet range.

Tool 2 · Project phase planner & readiness checklist

Plan the programme. Tick off each gate as you get ready.

Set your start month and your own phase durations. Tick what you already have. The planner shows readiness per phase and the next blocker. Durations are your inputs, not an XcellHost commitment.

Weeks per phase are illustrative placeholders* for planning. Your contractor's programme and long-lead equipment dates replace them.

0%ready
Next blocker—Go-live —
Compare

Build with XcellHost, split it across contractors, or colocate instead?

What mattersXcellHost build serviceSeparate contractorsColocation in XcellHost Mumbai
AccountabilityOne lead across all disciplinesSplit across civil, electrical, HVAC, fire, ITXcellHost runs the facility
Where it sitsYour premisesYour premisesXcellHost Tier IV, Mumbai
Money shapeCapex per phase, milestone billedCapex, many separate POsOpex, monthly per rack
CommissioningL1–L5 with integrated systems testOften per system, no ISTDone by the facility
Handover packSingle as-built and O&M setCollected from each vendorNot needed
After go-liveOptional AMC + 24×7 NOCSeparate AMCs per vendor24×7 NOC included
Best forData that must stay on-site, edge, AI hallsTeams with in-house DC engineeringMoving servers out of the office

Not sure? Compare on-prem vs colocation TCO or see co-location services.