Server room
1–4 racks in an office or plant. Precision cooling, UPS, clean-agent fire and access control.
typically up to ~20 kW IT*Some workloads have to stay on your premises: plant systems, latency-sensitive branches, regulated records, or GPU clusters you want next to your data. Building the room for them pulls in civil works, electrical, mechanical, fire, security, cabling and monitoring, usually from different contractors. XcellHost Data Center Build Services runs all of it as a single programme, from the first site survey to the day our NOC starts watching your alarms.
We size the facility from your racks and kW, set a design intent against Tier topology concepts and TIA-942 ratings, specify equipment OEM-agnostically, manage the build, and commission every system from factory tests through integrated systems testing. You get as-built drawings, test records and an operating manual. Then we can run it for you under AMC with 24×7 monitoring from Mumbai. Estimate costs first, or compare with colocation in our Tier IV data centre.
1–4 racks in an office or plant. Precision cooling, UPS, clean-agent fire and access control.
typically up to ~20 kW IT*Self-contained racks or enclosures at branches, towers, retail and factories, monitored remotely.
1–10 racks · remote sites*Prefabricated power, cooling and IT modules shipped to site and added as you grow.
phased capacity*Dedicated halls with redundant power and cooling paths, NOC, staging and secure perimeter.
tens to hundreds of racks*High-density GPU rows with liquid-ready cooling, heavier floors and bigger power blocks.
Liquid-cooled AI →Each discipline is designed against your load, redundancy target and site. Equipment is specified OEM-agnostically and confirmed at proposal.
Illustration of a typical dual-path (A + B) design. Your topology is set by the redundancy target you choose.
Site survey, utility and structural checks, risk review, requirement brief.
Gate · feasibility reportConcept to detailed design: layouts, one-lines, cooling, fire, BoQ.
Gate · design freezeOEM-agnostic specs, vendor comparison, factory witness tests (L1).
Gate · equipment on siteCivil, electrical, mechanical, fire, security and cabling works, QA daily.
Gate · mechanical completionL2–L5: inspection, start-up, functional tests, integrated systems test.
Gate · IST sign-offAs-builts, O&M manuals, training, AMC and 24×7 NOC onboarding.
Gate · live in NOCXcellHost has operated infrastructure for Indian businesses since 1999 and runs its own Tier IV data centre in Mumbai. That operating view shapes every build.
A single XcellHost project manager owns scope, programme, risk and every contractor interface.
01We specify by performance, compare equivalent equipment from leading OEMs and recommend on fit and lifecycle cost.
02Drawings, BoQ, test scripts, snag lists, as-builts and O&M manuals handed over in one pack.
03L1 factory tests through L5 integrated systems testing, with load banks and failure simulations.
04Phase-wise, itemised quotations in INR with GST invoices and milestone billing.
05After handover, DCIM and BMS alarms route to our NOC, with AMC visits and escalation.
06OEM-agnostic. We work with equipment from leading power, cooling, rack, fire and security manufacturers and choose per project. No equipment brand is fixed in advance, and XcellHost holds no exclusive OEM tie that would bias the choice.
A data hall in India has to cope with monsoon, high ambient heat, variable grid supply and local approvals, as well as data rules. The design helps you meet them. It does not replace your own compliance work.
Access control, CCTV, visitor logs and media handling support the reasonable security safeguards the Act expects for personal data.
Time sync, log capture and 24×7 monitoring designed in, helping you meet 6-hour incident reporting and 180-day log retention.
Facility controls and documentation prepared for the audits that government and public-sector hosting asks for.
Keeping payment and market data on infrastructure you control in India, with the physical controls your regulator's audit will check.
*Design standards & certifications confirmed at proposal.
Indicative · excl. 18% GST. Fixed-price packages are per site. Build, commissioning and operations are quoted once the design is frozen.
Fixed-price phases go to the cart. Everything else lands on your quotation request with the sizing filled in.
Your configuration is filled in below. Add the site address, drawings you have and your target date, and our infrastructure team replies within one business day.
The same rules of thumb as our cost calculator, plus the redundancy you design for. Illustrative engineering estimate, not a design.
IT kW = racks × kW per rack × (1 + headroom) Facility kW = IT kW × PUE Cooling kW = IT kW × 1.1 TR = cooling kW ÷ 3.517 UPS kVA = IT kW ÷ 0.9 PF × 1.25 headroom (per path) DG kVA = facility kW ÷ 0.8 PF × 1.25 margin Installed = design capacity × redundancy (N 1 · N+1 1.5 · 2N 2) Area = racks × sq ft per rack Capex* = IT kW × ₹ per kW (illustrative, excl. land)
Doors and roof panels close off the cold aisle, so servers breathe only supply air and hot exhaust goes straight back to the cooling units.
Illustrative temperatures. Design set-points follow your equipment's allowable inlet range.
Set your start month and your own phase durations. Tick what you already have. The planner shows readiness per phase and the next blocker. Durations are your inputs, not an XcellHost commitment.
Weeks per phase are illustrative placeholders* for planning. Your contractor's programme and long-lead equipment dates replace them.
| What matters | XcellHost build service | Separate contractors | Colocation in XcellHost Mumbai |
|---|---|---|---|
| Accountability | One lead across all disciplines | Split across civil, electrical, HVAC, fire, IT | XcellHost runs the facility |
| Where it sits | Your premises | Your premises | XcellHost Tier IV, Mumbai |
| Money shape | Capex per phase, milestone billed | Capex, many separate POs | Opex, monthly per rack |
| Commissioning | L1–L5 with integrated systems test | Often per system, no IST | Done by the facility |
| Handover pack | Single as-built and O&M set | Collected from each vendor | Not needed |
| After go-live | Optional AMC + 24×7 NOC | Separate AMCs per vendor | 24×7 NOC included |
| Best for | Data that must stay on-site, edge, AI halls | Teams with in-house DC engineering | Moving servers out of the office |
Not sure? Compare on-prem vs colocation TCO or see co-location services.