Routes planned before the first truck leaves
Overnight orders are batched and routed on GPU; drivers get their sequence on the app at shift start.
AI Factory →Logistics runs on systems that must agree with each other minute by minute: the TMS that plans trips, the WMS that knows where every pallet is, the trackers on every truck, the ERP that raises invoices and e-way bills, and the customer portal that answers "where is my shipment?". When they sit on different servers, links and vendors, nobody sees the whole picture — and an expired e-way bill or a dead warehouse link costs real money.
XcellCloud Logistics Cloud brings them together in our Mumbai Tier IV data centre: IoT Cloud for fleet devices, edge nodes at hubs, warehouse Wi-Fi and SD-WAN with 4G/5G, hosted TMS, WMS and ERP with logged GST integrations, and a 24×7 SOC across all of it.
Six problems logistics teams raise with us, each with its status and the fix.
Each GPS vendor has its own app; dispatch copies locations by hand.
DELAYEDOne IoT platform →Validity, vehicle changes and extensions tracked in spreadsheets.
AT RISKValidity worked out by system →Scanners stop, trucks wait at the dock, the WMS catches up hours later.
DELAYEDEdge node + SD-WAN →Last-mile routes drawn by hand; empty kilometres nobody measures.
DELAYEDAI route optimisation →One infected PC in billing can take the TMS and invoicing down for days.
AT RISK24×7 SOC + backups →Status calls flood the control room because there is no live tracking page.
DELAYEDProtected tracking portal →Each parcel is a service mapped to a logistics workload. Tap one to open it.
Tap a station for what runs there and which control protects it.
Instruments as published, checked October 2026. We help you meet these duties; the consignor, transporter or operator stays responsible for its own compliance.
| Requirement | How XcellHost helps | Evidence you get |
|---|---|---|
| GSTE-way bill for consignments above ₹50,000CGST Rules, rule 138 — Part A (consignment) by the registered person, Part B (vehicle / transport document) | ERP and TMS hosted with a logged API link to the e-way bill system through your GSP; Part B updated from the TMS when a vehicle changes. | API and job logs · EWB register per trip |
| GSTValidity by distanceRule 138 as amended by Notification 94/2020–Central Tax — one day per 200 km (from 1 Jan 2021); over-dimensional cargo one day per 20 km | Validity worked out from the planned distance and checked against the trip's ETA; alerts before expiry so extensions are raised in time. Try the validity calculator. | Expiry alerts · extension log |
| GST180-day document age and 360-day extension capGSTN update, effective 1 Jan 2025 — EWB only for documents dated within 180 days; extensions up to 360 days from generation | Document dates checked before the API call, extension history kept per bill so the 360-day limit is visible. | Validation rules · extension history |
| GSTMulti-factor authentication on EWB and e-invoice portalsGSTN advisory — phased from 20 Aug 2023; all taxpayers from 1 Apr 2025 | Portal and GSP credentials kept in a vault, MFA devices assigned to named users, logins logged — no shared passwords on the dispatch desk. | User and MFA register · access logs |
| GSTe-invoicing above ₹5 crore turnoverNotification 10/2023–Central Tax — from 1 Aug 2023 | Freight and warehousing invoices raised from the hosted ERP with a logged link to the invoice registration portal. | Integration diagram · IRN logs |
| NLPULIP — Unified Logistics Interface PlatformLaunched with the National Logistics Policy on 17 Sep 2022; 33 systems across 10 ministries (PIB, Oct 2024); access for registered companies under an NDA | We host the application that calls ULIP APIs once you are registered, with keys in a vault and every call logged. Access and terms are between you and ULIP. | API key custody · call logs |
| GatiShaktiPM GatiShakti National Master PlanLaunched 13 Oct 2021 — multimodal infrastructure planning; context, not a compliance duty | Your network-planning and lane analytics run on the Mumbai cloud and data lake, ready to combine with public datasets you are permitted to use. | Data lineage notes |
| DPDPDriver, consignee and customer personal dataDPDP Act 2023 & Rules notified Nov 2025, phased in | Location trails, phone numbers and addresses stored in India with encryption, access control, retention rules and logging; vDPO support for notices and rights requests. | Safeguards register · retention policy · breach runbook |
| CERT-In6-hour reporting, 180-day logsDirections under section 70B — 28 Apr 2022 (attacks on IoT devices are among reportable incidents) | SOC triage within the window; logs from servers, SD-WAN edges, IoT platform and devices kept in India for 180 days; NTP-synced clocks. | Incident report drafts · log retention evidence |
| MCADaily backup of books on servers in IndiaCompanies (Accounts) Rules, rule 3(5) — since 5 Aug 2022 | Daily backups of ERP and billing servers in India; see daily backup of books. | Backup job logs · server-location sheet |
Rule 138: one day for up to 200 km and one more for every 200 km or part of it; over-dimensional cargo counts 20 km a day. Illustrative — confirm on the e-way bill portal.
Sources: CGST Rules rule 138 (GST Council / CBIC) and Notification 94/2020–Central Tax; GSTN updates of Dec 2024 on e-way bill document age, extensions and MFA; CBIC Notification 10/2023–Central Tax; PIB on the National Logistics Policy, ULIP and PM GatiShakti (Oct 2024); DPDP Act 2023 and Rules (MeitY / PIB, Nov 2025); CERT-In directions of 28 Apr 2022; Companies (Accounts) Rules rule 3(5). For orientation only — not legal or tax advice.
—
Scenarios, not customer stories. Each names the XcellHost service that does the work.
Overnight orders are batched and routed on GPU; drivers get their sequence on the app at shift start.
AI Factory →Invoices from the ERP become e-way bills through the GSP; Part B fills from the TMS trip sheet.
Hosted ERP & TMS →The edge node keeps the WMS queue local, SD-WAN shifts to 5G, and scans sync when the line returns.
Edge Cloud →A temperature sensor crosses its limit; the IoT rule alerts the driver and the customer's QA before the load is lost.
IoT Cloud →A tracking page behind WAAP shows live status and ETA; control-room calls drop.
WAAP →Our SOC spots a TMS admin login from abroad, locks it and calls your on-call manager.
Security Operations →Systems, hubs and their links, device fleets and vendors, GST integrations and data flows.
Week 1–2*One hub and one fleet segment: devices onboarded, edge node and SD-WAN live, TMS on the cloud.
Weeks 2–5*Hubs and fleets added on a calendar that avoids your peak season; rollback ready for every wave.
Weeks 5–14*24×7 NOC and SOC, device health, monthly reports and capacity before the festive peak.
OngoingCompute uses the same rates as General Compute; IoT, edge, Wi-Fi and SD-WAN use the prices on their own XcellHost pages.
* Indicative — confirm with XcellHost. INR, excluding 18% GST. Prices marked "as on" are the same figures published on those XcellHost pages. Trackers and sensors, SIM data plans, access points, edge hardware, GSP charges, GPU and TMS / WMS / ERP licences are quoted separately.
Pick a workload to load sensible defaults, then adjust. Fixed-price lines go to the cart; GPU, hardware and licences come with a quotation.
Guidance only, not legal or tax advice. Pick your business type and answer yes or no. Nothing leaves your browser.
Illustrative, at the indicative IoT Cloud prices: ₹49 per device a month, minimum 100 devices, with a pooled allowance of 50,000 messages per device a month.
devices = vehicles × devices per vehicle + hub sensors · billed = max(100, devices)
messages / device / month = 3,600 ÷ interval × hours × days
cost = billed × ₹49 a month · data ≈ messages × 200 bytes