What Manufacturing Cloud is

One platform from the shop floor to the ERP and the annual report.

Indian plants run on a stack that grew one project at a time: an ERP server in the head office, an MES at each plant, CAD workstations with licences tied to one desk, PLC data that never leaves the line, and a flat network where an infected office PC can reach a SCADA screen. Meanwhile listed companies owe BRSR disclosures, PLI applicants must evidence production and sales, and every body corporate must report cyber incidents to CERT-In within six hours.

XcellCloud Manufacturing Cloud brings it together: SAP and other ERP in our Mumbai Tier IV data centre, MES and historians on cloud or edge nodes at the plant, PLM and CAD on cloud desktops, IoT Cloud for machines and meters, an OT assessment to segment the line from the office, and DR for the systems that keep dispatch moving.

0in business since
₹49per IoT device a month
0uptime SLA
24×7NOC + SOC from Mumbai
Connects PLCs & machines Energy meters MES & historian SAP & ERP Suppliers & dealers
Industry challenges

Walk the plant. Tap a pin to see the problem — and the fix.

Typical of Indian plants we assess; illustrative, not customer data.

Head office
Shop floor · lines 1–3
Design office
Stores & dispatch
Utilities & meters
Reference architecture

Purdue levels, an industrial DMZ — and a cloud that only talks to the DMZ.

Tap a level. The line keeps running even if the cloud link drops; edge nodes buffer and catch up.

Regulatory mapping

What Indian manufacturers report — and the data behind it.

Checked October 2026 against SEBI, DPIIT/PIB, CERT-In, MeitY, MCA and GST sources. We help you meet these requirements; your company stays responsible for its filings.

RequirementHow XcellHost helpsEvidence you get
SEBIBRSR for the top 1,000 listed companiesBusiness Responsibility & Sustainability Report, LODR — energy, water, waste and emissions disclosuresEnergy, water and production data collected from meters through IoT Cloud into one India-hosted dataset with history.Meter-level data export · calculation workbook
SEBIBRSR Core — assessment or assuranceSEBI circular 28 Mar 2025 — glide path: top 150 (FY 2023-24) → 250 → 500 → 1,000 (FY 2026-27)Data lineage from meter to report, access logs and immutable backups an assessor or assurer can trace.Lineage report · access and change logs
SEBIValue-chain ESG disclosuresSame circular — partners with 2% or more of purchases or sales; voluntary for the top 250 from FY 2025-26Supplier and dealer portals on the cloud to collect partner ESG data in one format.Partner submission records
PLIProduction-linked incentives14 sectors, ₹1.97 lakh crore outlay announced in 2020-21; incentives on verified incremental production and salesERP, MES and IoT data kept together with audit trails and backups, so production and sales figures can be reconciled for claims.Reconciliation extracts · retention evidence
CERT-In6-hour reporting, 180-day logsDirections under section 70B — 28 Apr 2022; covers body corporatesSOC monitoring across office and OT DMZ, logs kept in India for at least 180 days, NTP time sync on managed systems.Incident report drafts · log retention settings
DPDPEmployee, dealer and customer personal dataDPDP Act 2023 & Rules (13 Nov 2025) — most duties from 13 May 2027; Board report within 72 hours of a breachHR, dealer and service data on encrypted, access-logged systems; DPO support through vDPO.Safeguards register · breach runbook
MCADaily backup of books in India, audit trailCompanies (Accounts) Rules, rules 3(5) and 3(1)ERP backed up daily to storage in India with the audit trail preserved; see daily backup of books.Backup job logs · server-location sheet
GSTe-Invoicing and e-way bills from ERPe-invoicing above ₹5 crore AATO; 30-day IRP limit at ₹10 crore and above from 1 Apr 2025Always-on ERP in a Tier IV data centre so invoices and e-way bills are generated when trucks leave, not when a server comes back.Uptime reports · integration job logs

Sources: SEBI circular on BRSR Core and value-chain disclosures (28 Mar 2025) and BRSR framework under LODR; PIB/DPIIT on the PLI schemes; cert-in.org.in directions of 28 Apr 2022; MeitY DPDP Rules (G.S.R. 846(E)); MCA Companies (Accounts) Rules; CBIC notification 10/2023-CT and GSTN advisory of 5 Nov 2024. For orientation only — not legal or tax advice.

Who it's for

Five kinds of manufacturer, five starting points.

What matters most
    Typical workloads
      Where we usually start

      —

      —

      Use cases

      What plants run on Manufacturing Cloud.

      Illustrative scenarios, not customer stories.

      ERPSAP for a multi-plant group

      One S/4HANA or Business One landscape in Mumbai, plants on SD-WAN, DR replica at a second site*.

      SAP hosting + SD-WAN
      OEELive OEE per line

      Machine states and counts from PLCs through an edge node to a cloud dashboard; downtime reasons captured at the HMI.

      IoT Cloud + Edge M
      DesignCAD from anywhere

      Design engineers and vendors open models on GPU cloud desktops; files never leave the data centre.

      Enterprise VDI · GPU on quote
      SecurityOffice ransomware stays in the office

      Industrial DMZ and segmentation from the OT assessment stop it reaching SCADA; OT backups restore HMIs.

      OT assessment + Acronis OT
      ESGEnergy data for BRSR

      Meters on every feeder roll up to plant and company Scope 1 and 2 figures with a trail an assessor can follow.

      IoT Cloud + energy baseline
      Supply chainSupplier and dealer portals

      Schedules, ASNs and claims on a portal in front of the ERP, protected by WAF and MFA.

      Cloud servers + WAAP
      How XcellHost delivers

      Plant engineers and cloud engineers — on the same ticket.

      Assess the plant first

      Smart factory and OT assessments map machines, networks and risks before anything is connected.

      01
      Edge where it matters

      Edge nodes at plants keep MES and buffers local; the cloud gets clean, time-stamped data.

      02
      Mumbai Tier IV core

      ERP, historians and analytics in XcellHost's own data centre, DR at a second site in India*.

      03
      24×7 NOC and SOC

      Links, edge nodes, servers and the OT DMZ watched around the clock.

      04
      Monthly INR billing

      Per device, per node, per vCPU — no capex for servers that sit idle between shifts.

      05
      Certified operations

      ISO 27001 and ISO 20000-1, MeitY empanelled, Microsoft Gold Partner.

      06
      Plans

      Connect a line, run the plant, or move the whole group.

      Every figure is the price already published on the linked XcellHost page.

      Connected Line

      IIoT for one line or plant

      ₹49/ device / month · min 100
      • IoT platform setup, one-time₹49,999
      • Edge node S per plant₹14,999
      • Edge M · Edge L₹24,999 · ₹44,999
      • Secure backhaul per node₹4,999
      Recommended start Plant Cloud

      ERP / MES servers, DR and SOC

      ₹599/ vCPU / month
      • RAM per GB · NVMe per GB₹149 · ₹6
      • Managed DR per workload₹2,499
      • SOC Professional per endpoint₹449
      • SD-WAN per plant₹2,999
      Smart & Secure Programme

      Assess, segment, connect every plant

      ₹99,999/ plant · readiness assessment
      • OT Site Assessment, first site₹2,49,999
      • Each extra site₹1,49,999
      • Energy & carbon baseline₹74,999
      • SAP landscapesfrom ₹49,999/mo
      ₹1,999 · ₹3,499VDI Knowledge / Power user per month · as on Enterprise VDI; GPU desktops price on quote
      ₹49,999SAP non-production landscape / month · as on SAP Hosting; production ₹1,49,999
      ₹999 + ₹1,999Server backup / month + India storage per TB · as on XcellBackup
      ₹499 / ₹799Managed Wi-Fi per AP / month · as on Managed Wi-Fi

      Indicative — confirm with XcellHost. INR, excluding 18% GST. All figures are the same as published on the linked XcellHost pages (Industry 5.0, OT Assessment, IoT Cloud, Edge Cloud, Managed SD-WAN, Security Operations, Resilience Operations). SAP and CAD licences, GPU, sensors and plant hardware are quoted separately.

      Configure

      Build your Manufacturing Cloud. See the rupee total.

      Pick a workload for defaults, then set plants, devices and servers.

      1 · Workload
      Edge node per plant
      SD-WAN per plant
      Add-ons
      Your estimate · indicative

      Manufacturing Cloud · SAP / ERP · 2 plants

        Monthly₹0
        One-time₹0
        Subtotal · first invoice₹0
        GST (18%)₹0
        Total incl. GST₹0
        Indicative — confirm with XcellHost. INR excl. 18% GST. SAP and CAD licences, GPU, sensors and hardware are quoted separately.
        Tool · plant digital & OT readiness

        How ready is your plant — and what to fix first?

        Guidance only. Tell us about your company, then answer yes or no. Nothing leaves your browser.

        Reporting that typically applies
          Readiness check
          Readiness · guidance
          0%answer the questions
            Applicability reflects the instruments cited on this page as checked October 2026. Confirm with your compliance and sustainability teams.
            Tool · IIoT data & edge sizing

            How much data will your machines send — and what will it cost?

            Illustrative, at the indicative XcellHost prices on this page.

            Estimate · illustrative
            Samples per second0
            Data per day0
            Hot storage0
            Edge node per plant—
            Monthly · excl. GST₹0—
              Formula samples/s = devices × tags ÷ interval · GB/day = samples/s × 86,400 × bytes ÷ 10⁹ hot GB = GB/day × days × 1.3 (index overhead) · on NVMe at ₹6/GB edge per plant: S below 5,000 samples/s, M below 20,000, else L · IoT ₹49 × max(100, devices)
              Illustrative. Thresholds for edge size and the 1.3× index overhead are planning assumptions; compression in your historian can cut storage a lot.
              Compare

              Manufacturing cloud, generic public cloud or servers at every plant?

              Shop-floor dataEdge nodes buffer locally; IoT Cloud in MumbaiIoT services; edge hardware and OT know-how are yoursHistorian per plant, hard to compare plants
              OT securityAssessment, industrial DMZ design and SOC from one teamCloud security only; OT left to youOften a flat network
              SAP / ERPHosted in Mumbai with DR and Basis optionsCertified infrastructure; you run Basis and DRServer room at head office
              CAD & PLMCloud desktops; GPU on quote; files stay in the DCGPU instances, metered by the hourWorkstations tied to desks
              BillingPer device, node and vCPU, fixed monthly INRUsage-based, often USD-linkedCapex and AMCs per plant
              Support24×7 NOC and SOC in MumbaiSupport plans, ticket basedPlant IT, one shift
              Getting started

              One plant first, then the rest on a template.

              1. 01
                Plant walkMachines, networks, systems and pain points.
                Week 1*
              2. 02
                OT & readiness reportRisks, segmentation plan and use cases with payback.
                Weeks 2–4*
              3. 03
                Core in MumbaiERP, historian and DR set up; SD-WAN to the plant.
                Weeks 3–6*
              4. 04
                Pilot lineEdge node, sensors and OEE dashboard on one line.
                Weeks 5–8*
              5. 05
                DR drillERP switched over, dispatch tested from DR.
                Before scale-out*
              6. 06
                Roll out & runOther lines and plants, 24×7 NOC and SOC.
                Ongoing