One S/4HANA or Business One landscape in Mumbai, plants on SD-WAN, DR replica at a second site*.
SAP hosting + SD-WANOne platform from the shop floor to the ERP and the annual report.
Indian plants run on a stack that grew one project at a time: an ERP server in the head office, an MES at each plant, CAD workstations with licences tied to one desk, PLC data that never leaves the line, and a flat network where an infected office PC can reach a SCADA screen. Meanwhile listed companies owe BRSR disclosures, PLI applicants must evidence production and sales, and every body corporate must report cyber incidents to CERT-In within six hours.
XcellCloud Manufacturing Cloud brings it together: SAP and other ERP in our Mumbai Tier IV data centre, MES and historians on cloud or edge nodes at the plant, PLM and CAD on cloud desktops, IoT Cloud for machines and meters, an OT assessment to segment the line from the office, and DR for the systems that keep dispatch moving.
Walk the plant. Tap a pin to see the problem — and the fix.
Typical of Indian plants we assess; illustrative, not customer data.
Cloud, cyber security and AI — mapped to plant workloads.
Pick a workload to light up what it uses.
Purdue levels, an industrial DMZ — and a cloud that only talks to the DMZ.
Tap a level. The line keeps running even if the cloud link drops; edge nodes buffer and catch up.
What Indian manufacturers report — and the data behind it.
Checked October 2026 against SEBI, DPIIT/PIB, CERT-In, MeitY, MCA and GST sources. We help you meet these requirements; your company stays responsible for its filings.
| Requirement | How XcellHost helps | Evidence you get |
|---|---|---|
| SEBIBRSR for the top 1,000 listed companiesBusiness Responsibility & Sustainability Report, LODR — energy, water, waste and emissions disclosures | Energy, water and production data collected from meters through IoT Cloud into one India-hosted dataset with history. | Meter-level data export · calculation workbook |
| SEBIBRSR Core — assessment or assuranceSEBI circular 28 Mar 2025 — glide path: top 150 (FY 2023-24) → 250 → 500 → 1,000 (FY 2026-27) | Data lineage from meter to report, access logs and immutable backups an assessor or assurer can trace. | Lineage report · access and change logs |
| SEBIValue-chain ESG disclosuresSame circular — partners with 2% or more of purchases or sales; voluntary for the top 250 from FY 2025-26 | Supplier and dealer portals on the cloud to collect partner ESG data in one format. | Partner submission records |
| PLIProduction-linked incentives14 sectors, ₹1.97 lakh crore outlay announced in 2020-21; incentives on verified incremental production and sales | ERP, MES and IoT data kept together with audit trails and backups, so production and sales figures can be reconciled for claims. | Reconciliation extracts · retention evidence |
| CERT-In6-hour reporting, 180-day logsDirections under section 70B — 28 Apr 2022; covers body corporates | SOC monitoring across office and OT DMZ, logs kept in India for at least 180 days, NTP time sync on managed systems. | Incident report drafts · log retention settings |
| DPDPEmployee, dealer and customer personal dataDPDP Act 2023 & Rules (13 Nov 2025) — most duties from 13 May 2027; Board report within 72 hours of a breach | HR, dealer and service data on encrypted, access-logged systems; DPO support through vDPO. | Safeguards register · breach runbook |
| MCADaily backup of books in India, audit trailCompanies (Accounts) Rules, rules 3(5) and 3(1) | ERP backed up daily to storage in India with the audit trail preserved; see daily backup of books. | Backup job logs · server-location sheet |
| GSTe-Invoicing and e-way bills from ERPe-invoicing above ₹5 crore AATO; 30-day IRP limit at ₹10 crore and above from 1 Apr 2025 | Always-on ERP in a Tier IV data centre so invoices and e-way bills are generated when trucks leave, not when a server comes back. | Uptime reports · integration job logs |
Sources: SEBI circular on BRSR Core and value-chain disclosures (28 Mar 2025) and BRSR framework under LODR; PIB/DPIIT on the PLI schemes; cert-in.org.in directions of 28 Apr 2022; MeitY DPDP Rules (G.S.R. 846(E)); MCA Companies (Accounts) Rules; CBIC notification 10/2023-CT and GSTN advisory of 5 Nov 2024. For orientation only — not legal or tax advice.
Five kinds of manufacturer, five starting points.
—
—
What plants run on Manufacturing Cloud.
Illustrative scenarios, not customer stories.
Machine states and counts from PLCs through an edge node to a cloud dashboard; downtime reasons captured at the HMI.
IoT Cloud + Edge MDesign engineers and vendors open models on GPU cloud desktops; files never leave the data centre.
Enterprise VDI · GPU on quoteIndustrial DMZ and segmentation from the OT assessment stop it reaching SCADA; OT backups restore HMIs.
OT assessment + Acronis OTMeters on every feeder roll up to plant and company Scope 1 and 2 figures with a trail an assessor can follow.
IoT Cloud + energy baselineSchedules, ASNs and claims on a portal in front of the ERP, protected by WAF and MFA.
Cloud servers + WAAPPlant engineers and cloud engineers — on the same ticket.
Smart factory and OT assessments map machines, networks and risks before anything is connected.
01Edge nodes at plants keep MES and buffers local; the cloud gets clean, time-stamped data.
02ERP, historians and analytics in XcellHost's own data centre, DR at a second site in India*.
03Links, edge nodes, servers and the OT DMZ watched around the clock.
04Per device, per node, per vCPU — no capex for servers that sit idle between shifts.
05ISO 27001 and ISO 20000-1, MeitY empanelled, Microsoft Gold Partner.
06Connect a line, run the plant, or move the whole group.
Every figure is the price already published on the linked XcellHost page.
IIoT for one line or plant
- IoT platform setup, one-time₹49,999
- Edge node S per plant₹14,999
- Edge M · Edge L₹24,999 · ₹44,999
- Secure backhaul per node₹4,999
ERP / MES servers, DR and SOC
- RAM per GB · NVMe per GB₹149 · ₹6
- Managed DR per workload₹2,499
- SOC Professional per endpoint₹449
- SD-WAN per plant₹2,999
Assess, segment, connect every plant
- OT Site Assessment, first site₹2,49,999
- Each extra site₹1,49,999
- Energy & carbon baseline₹74,999
- SAP landscapesfrom ₹49,999/mo
Indicative — confirm with XcellHost. INR, excluding 18% GST. All figures are the same as published on the linked XcellHost pages (Industry 5.0, OT Assessment, IoT Cloud, Edge Cloud, Managed SD-WAN, Security Operations, Resilience Operations). SAP and CAD licences, GPU, sensors and plant hardware are quoted separately.
Build your Manufacturing Cloud. See the rupee total.
Pick a workload for defaults, then set plants, devices and servers.
Manufacturing Cloud · SAP / ERP · 2 plants
How ready is your plant — and what to fix first?
Guidance only. Tell us about your company, then answer yes or no. Nothing leaves your browser.
How much data will your machines send — and what will it cost?
Illustrative, at the indicative XcellHost prices on this page.
samples/s = devices × tags ÷ interval · GB/day = samples/s × 86,400 × bytes ÷ 10⁹
hot GB = GB/day × days × 1.3 (index overhead) · on NVMe at ₹6/GB
edge per plant: S below 5,000 samples/s, M below 20,000, else L · IoT ₹49 × max(100, devices)
Manufacturing cloud, generic public cloud or servers at every plant?
One plant first, then the rest on a template.
- 01Plant walkMachines, networks, systems and pain points.Week 1*
- 02OT & readiness reportRisks, segmentation plan and use cases with payback.Weeks 2–4*
- 03Core in MumbaiERP, historian and DR set up; SD-WAN to the plant.Weeks 3–6*
- 04Pilot lineEdge node, sensors and OEE dashboard on one line.Weeks 5–8*
- 05DR drillERP switched over, dispatch tested from DR.Before scale-out*
- 06Roll out & runOther lines and plants, 24×7 NOC and SOC.Ongoing