Find the weak points in your plant network — without touching a running line.

XcellHost maps every controller, HMI and engineering workstation by listening, not scanning. Then we draw your zones and conduits to IEC 62443, rate each risk by what it could do to safety and production, and hand you a roadmap that fits your shutdown calendar.

Powered by VXcellHost Vortex SOC · Mumbai IEC 62443-aligned OT assessment by XcellHost
Plant-safepassive first · no controller changes
IEC 62443-3-2zones, conduits, SL-T vs SL-A
OT·HMIPlant A · assessment day 4 · sample 01 · Passive discovery
0
Assets identified—
FINDING OT-04 · sampleHigh Engineering workstation reachable from office LAN Level 2 · no conduit rule · fix in next shutdown window
Passive discovery first
Zones & conduits drawn
PLC, DCS, SCADA & HMI
Safety & production risk
Fits your shutdown windows
INR billing with GST
✦Ask AI about OT AssessmentChatGPTClaudePerplexityGoogle AICopilot
Works with PLCs & RTUsDCSSCADA & HMIHistoriansSafety systemsModbus · DNP3 · IEC 61850 · OPC UA
ISO 27001 & 20000-1Microsoft Gold Partner10,000+ customersSince 199999.95% uptime SLA24×7 NOC + SOC
Overview

A plant is not an office network with more cables.

In IT, a security test that slows a laptop is an inconvenience. In a plant, an aggressive scan can freeze a controller, trip a line or confuse a safety system. That is why XcellHost OT Assessment starts by listening: we copy traffic from a mirror port and build your asset inventory without sending anything to a live device.

From that inventory we draw your zones and conduits the way IEC 62443-3-2 describes them, set a target security level for each zone, compare it with what is actually in place, and rank every gap by its consequence on people, production and the environment — not by a generic score.

ListenMapRateRoadmap
Same cable · different prioritieswhy OT needs its own method
IT network
  1. 1Confidentiality
  2. 2Integrity
  3. 3Availability
  4. –Safety
OT network
  1. 1Safety
  2. 2Availability
  3. 3Integrity
  4. 4Confidentiality
Scanning a PLC like a laptop can stop it.Listening first sees the same assets, safely.
AssessesPLCs & RTUsHMI & SCADAEngineering workstationsHistoriansIndustrial networksRemote access
Why it matters now

Indian plants are connecting faster than they are being segmented.

Remote monitoring, ERP integration and OEM support links have joined plant networks to the office — and to the internet. Most of the equipment on the other side was designed for a closed world.

01

IT/OT convergence

Dashboards, MES and cloud analytics need plant data. Each new link is a path in, unless it passes through a controlled boundary.

02

Systems you cannot patch

Controllers and HMIs run for 15–25 years. Many can only be updated during a shutdown — some never. Compensating controls matter more than patch lists.

03

Vendor and integrator access

OEMs, system integrators and AMC partners often keep their own remote tools into the plant. Few are logged, time-boxed or protected with MFA.

04

Consequences are physical

A cyber incident in OT can mean a stopped line, a spoiled batch, a safety trip or an environmental release — not just lost files.

05

Regulators are asking

CERT-In directions apply to plants too, power-sector rules call for periodic OT audits, and critical infrastructure falls under NCIIPC guidance.

Scope · what we assess

From the field device to the enterprise firewall.

We use the Purdue reference model as a map. Choose a level to see what the assessment looks at there.

Methodology

Seven phases, passive first, plant-safe throughout.

Aligned with IEC 62443-3-2 risk assessment and NIST SP 800-82 guidance for OT. Scroll to follow the flow.

  1. 01 · Authorise & plan

    Scope, written authorisation, rules of engagement, site safety induction and shutdown calendar agreed.

  2. 02 · Document review

    Network drawings, asset lists, P&IDs where relevant, remote-access contracts and existing policies.

  3. 03 · Site walk-down

    Escorted visit to control rooms and panels; interviews with operations, maintenance and IT.

  4. 04 · Passive capture

    A collector on a mirror port or tap records traffic for an agreed window. Nothing is sent to live devices.

  5. 05 · Zones & risk

    Zones and conduits drawn, SL-T set per zone, SL-A measured, risks rated by consequence.

  6. 06 · Report & roadmap

    Findings workshop with plant and IT leads; phased roadmap matched to shutdown windows.

  7. 07 · Retest

    After fixes, we re-verify the critical and high findings and update the risk register.

Plant-safe by designGuard-rails written into every engagement
  • Written authorisationsigned by the plant head or an authorised officer before any site work
  • Rules of engagementnamed networks, cells and devices; anything outside is out of scope
  • Passive by defaultno scanning of live controllers; any active check runs only on spares or in an approved window
  • Safe testing windowsplanned with operations; changes follow your management-of-change process
  • Data handling & NDAcaptures and drawings encrypted, kept in India, deleted at close-out on request
  • Escorted, inducted engineerssite safety rules and PPE followed; your operator stays in control
Deliverables

What you receive — for the plant team and for the board.

OT asset inventory

Make, model, firmware, protocol and Purdue level for each device seen.

Zone & conduit drawing

Your network as IEC 62443 zones and conduits, current and target.

Risk register

Each gap with SL-T vs SL-A, consequence rating and owner.

Technical report

Findings with evidence, affected assets and recommended controls.

Executive summary

Two pages: top risks, decisions needed, indicative budget.

Remediation roadmap

0–30, 30–90 and 90–180-day actions mapped to shutdown windows.

Retest

Re-verification of critical and high findings after fixes.

Findings workshop

A walk-through with operations, maintenance, IT and management.

Sample findings illustrative · not a real site
HighFinding #04 · engineering workstation reachable from office LANLevel 2 · add conduit rule via DMZ · fixed in 48 h (sample)
HighFinding #07 · vendor remote tool direct to HMIno MFA, no session log · moved to DMZ jump host (sample)
MediumFinding #11 · shared operator login on HMIsnamed accounts at next shutdown (sample)
MediumFinding #12 · historian dual-homed on IT and OTremove second NIC, replicate via DMZ (sample)
LowFinding #15 · unsynchronised clocks on 9 devicespoint to plant NTP source (sample)
India compliance mapping

One assessment, evidence for several regulators.

The assessment helps you meet these expectations. It does not replace your own compliance programme, and obligations depend on your sector and status — confirm with your compliance team.

FrameworkWhat it expects (summary)How the assessment helps
CERT-In directionsApril 2022Report specified incidents within 6 hours; keep ICT logs for 180 days in India; synchronise clocks.Checks whether OT logs exist, are retained and time-synced — and where they are missing.
CEA · power sectorguidelines & draft 2024 regulationsCISO, IT/OT segregation, controlled remote access and periodic OT cyber-security audits.Zone drawings, segregation evidence and a risk register for your OT audit file.
NCIIPCcritical information infrastructureProtection of notified CII, asset documentation and risk management.An asset inventory and conduit map that feed CII documentation.
DPDP Act 2023personal dataReasonable security safeguards for personal data, incl. CCTV, access-control and HR data on plant systems.Identifies personal data on OT-adjacent systems and the safeguards around it.
RBI · SEBI CSCRF · IRDAIregulated groupsGroup-wide cyber risk reporting for regulated entities and their key operations.OT risk expressed in the same register format as your IT risks.
MeitY · IEC 62443national & internationalNational cyber-security guidance; IEC 62443 as the international OT reference.Findings mapped to IEC 62443 foundational requirements FR1–FR7.
Numbers to remember
0hours · CERT-In incident reporting window
0days · log retention CERT-In expects
0IEC 62443 foundational requirements we map to
Regulatory summaries are indicative — confirm obligations with your compliance team.
Use cases by industry

Different plants, different crown jewels.

Packages

Priced per site. Monitoring when you are ready.

A site is one plant location with its own control network. Indicative prices, INR, excluding 18% GST.

Start hereOT Site Assessment1 site · one-time
₹2,49,999*
Indicative — confirm with XcellHost · excl. 18% GST
  • Passive asset discovery
  • Zone & conduit drawing
  • Risk register, SL-T vs SL-A
  • Roadmap & findings workshop
  • One retest of critical & high findings*
Configure & buy
Additional siteper extra site · same engagement
₹1,49,999*
Indicative — confirm with XcellHost · excl. 18% GST
  • Same method at each extra plant
  • Group-level asset view
  • Site-by-site comparison
  • One consolidated board summary
Configure 3 sites
Passive network monitoringcontinuous · after the assessment
On quote
sized on sites, segments & assets
  • Continuous passive OT visibility
  • New-device and new-path alerts
  • Watched by XcellHost Vortex SOC 24×7
  • Monthly OT risk report

*Indicative placeholder prices and inclusions · excl. 18% GST · to be confirmed by XcellHost. Travel outside Mumbai metro may be quoted separately.

Configure

Build your assessment — see the total with GST.

Sites to assess 1 site
Plant type Manufacturing
Add passive network monitoring
Your OT assessment
₹2,94,999
Payable incl. 18% GST · indicative
Indicative — confirm with XcellHost. Work starts only after written authorisation and a site safety induction.
Tool · OT site scoper

Describe your plant — see how long the assessment takes.

An indicative plan for one site. We confirm it after the scoping call.

Production lines / process cells 4
Legacy, unsupported systems Some
Vendor remote access into OT Yes
Safety instrumented system Present
Mediumsite complexity
Recommended: OT Site AssessmentUse in configurator →
Tool · IEC 62443 zone checklist

Pick a zone, tick what is true — see where it falls short.

Fourteen plain-language checks across the seven IEC 62443 foundational requirements. An indicative self-check, not a certification.

Target security level (SL-T) SL 2
FRs below target—
Self-assessed—
Compared

An IT-style scan of a plant vs an OT assessment.

IT-style vulnerability scanXcellHost OT Assessment
DiscoveryActive scans across every addressPassive capture; active checks only on spares or in approved windows
Asset detailIP address and open portsMake, model, firmware, protocol and Purdue level
Risk ratingGeneric severity scoreConsequence on safety, production and environment
FrameworkIT checklistIEC 62443-3-2 zones, conduits, SL-T vs SL-A
People involvedSecurity team onlyOperations, control engineers, IT and OEM where needed
Fix advice"Patch everything"Compensating controls where patching is not possible
TimingWhenever the scanner runsRoadmap matched to your shutdown calendar
How to engage

From first call to retest in six steps.

  1. 1Scoping call

    30 minutes on sites, networks and constraints. NDA signed.

  2. 2Proposal & quote

    Fixed price per site, timeline and team, in INR with GST.

  3. 3Authorisation

    Rules of engagement signed; site induction booked.

  4. 4On site & capture

    Walk-down, interviews and passive capture window.

  5. 5Report & workshop

    Findings, zone drawing and roadmap presented.

  6. 6Retest or monitor

    Re-verify fixes; optionally continue with passive monitoring.