Pharmaceutical Cloud

Validated systems need qualified infrastructure underneath.

A LIMS or QMS is only as trustworthy as the servers, storage, clocks and backups beneath it. US FDA 21 CFR Part 11, EU GMP Annex 11 and India's revised Schedule M all expect computerised systems to be validated, access-controlled and audit-trailed, and inspectors from export markets will ask how your hosting provider is qualified and controlled.

XcellCloud Pharmaceutical Cloud gives you that foundation. We are GxP-ready, with validation support* — not "GxP certified", because no such certificate exists for a host. We qualify the infrastructure, document it, keep it under change control, and support your team as you validate the applications that run on it.

ALCOA+ · what the hosting layer supports

—

Industry challenges

Six findings that start in the server room.

Typical data-integrity and computerised-system gaps auditors raise. Each card says what the hosting layer can do about it.

Finding 01High
Shared admin logins on servers

Nobody can say who changed a configuration or deleted a file.

Named accounts through PAM, sessions recorded
Finding 02High
Clocks that drift

Audit-trail time stamps disagree between instruments, LIMS and servers.

NTP-synced clocks across every host
Finding 03Medium
Backups never restored

Records are "backed up" but no one has proved they come back complete.

Scheduled restore tests with signed records
Finding 04Medium
Unqualified infrastructure

Applications were validated, but the servers and network under them were not.

Infrastructure IQ / OQ pack*
Finding 05Medium
Uncontrolled changes

Patches and upgrades applied without impact assessment on GxP systems.

Change control linked to your QMS
Finding 06Watch
Evidence takes days

Inspectors wait while IT hunts for logs, certificates and supplier documents.

Evidence vault, exported in minutes
Solution stack

Cloud, cyber security and AI for each GxP system.

Pick a system. The stack shows what we put under it and what stays your responsibility.

Cloud

—

Cyber security

—

AI

—

Stays with you

—

Reference architecture

A validated zone, a business zone — and controls that span both.

Tap any block for what runs there, the control that protects it and the related service.

GxP zone · qualified, under change control
Business zone
Mumbai Tier IV · qualified infrastructure · supplier audit access
Regulatory mapping

Requirement, how we help, and the evidence in your file.

Checked October 2026 against official and standards-body sources. We help you meet these requirements; you remain responsible for validating your systems and for your GMP / GCP compliance.

RequirementHow XcellHost helpsEvidence you get
US FDAElectronic records and signatures21 CFR Part 11 — validation, audit trails, access control, record retentionQualified hosting, NTP-synced clocks, named access through PAM, immutable backups and retention you set. Your application provides the e-signature and audit-trail functions; we support its validation*.Infrastructure IQ / OQ · access logs · backup and restore records
US FDARisk-based software assuranceComputer Software Assurance for Production and Quality System Software — final guidance, 24 Sep 2025 (written for device makers; widely read across GxP)Validation support* that spends test effort on high-risk functions and uses unscripted testing where risk is low — reflected in the validation effort calculator.Risk assessment · test summary
EU GMPComputerised systemsEudraLex Vol 4, Annex 11 (in force since 2011); revision consulted 7 Jul – 7 Oct 2025 with Chapter 4 and a new Annex 22 on AISupplier documentation and audit access for you, backup and restore checks, change control and incident handling for the infrastructure layer. We track the revision as it is finalised.Supplier questionnaire · SLA · change and incident records
PIC/S · WHOALCOA+ data integrityPIC/S PI 041-1 (2021); WHO TRS 1033, Annex 4 — Guideline on data integrity (2021)Enduring and available records: replicated storage in India, immutable backups, long-term archive, clock sync and tamper-evident logs.Retention policy · restore tests · log integrity checks
GAMPRisk-based validation lifecycleISPE GAMP® 5, Second Edition (2022)Infrastructure treated as qualified platform; your applications categorised and validated with templates and support from our team*.Validation plan templates · trace matrix support
IndiaRevised Schedule M (GMP)Drugs Rules, 1945 — G.S.R. 922(E), 28 Dec 2023; MSMEs (turnover ≤ ₹250 crore) had until 31 Dec 2025 on application. Adds a pharmaceutical quality system, quality risk management and computerised systems in GMP scope.Qualified, documented hosting for LIMS, QMS and MES; change control and backups that fit your PQS; evidence for CDSCO and state inspections.Qualification pack · change log · backup records
DPDPPatient and trial-participant dataDPDP Act 2023 & Rules 2025 (notified 14 Nov 2025) — safeguards, breach details to the Board within 72 hours, one-year logsIndia-hosted storage, encryption, access logging and breach runbooks; DPO support via vDPO.Safeguards register · breach runbook
CERT-In6-hour reporting, 180-day logsDirections under section 70B — 28 Apr 202224×7 SOC, report drafts inside the window, logs in India for 180 days or longer.Incident drafts · retention evidence
ICHComputerised systems in clinical trialsICH E6(R3) Good Clinical Practice — Step 4, 6 Jan 2025Hosting for EDC, CTMS, eTMF and safety databases with access control, audit logs, backup, DR drills and data kept in India.Hosting qualification · DR drill report
CDSCOClinical trial records in IndiaNew Drugs and Clinical Trials Rules, 2019Long-term, India-hosted archive for trial records with restore tests and controlled access for sponsors, sites and auditors.Archive register · access logs

On wording. There is no "GxP certification" for a cloud provider. Regulators inspect you; your validation and supplier assessment show the hosting is fit for purpose. We supply the infrastructure evidence and support*, and invite your QA team to audit us.

Sources: ecfr.gov (21 CFR Part 11); federalregister.gov (CSA final guidance, 24 Sep 2025); health.ec.europa.eu (EudraLex Vol 4 Annex 11 and the 2025 consultation); picscheme.org (PI 041-1); WHO TRS 1033 Annex 4; cdsco.gov.in and the Gazette (G.S.R. 922(E) and MSME extension); ICH E6(R3); MeitY / PIB (DPDP Rules); cert-in.org.in. GAMP is a registered trademark of ISPE. For orientation only — not regulatory advice.

Who it's for

From API plants to clinical research.

—

—

Systems first
    Rules in view
      Use cases

      Where pharma companies start on our cloud.

      Platform-neutral: we host the software you have licensed. Product names belong to their owners.

      LIMS consolidation

      Several plant LIMS moved to one hosted instance with qualified infrastructure and instrument links over private connectivity.

      Chromatography data on cloud

      CDS servers and raw data off lab PCs, with time sync, backups and access per analyst.

      SAP for pharma

      Batch management and QM on SAP hosting or S/4HANA private cloud.

      QMS and document control

      Deviations, CAPA, change control and SOPs on a validated, backed-up platform.

      Clinical and safety data

      EDC, CTMS, eTMF and pharmacovigilance databases kept in India with DR drills.

      R&D and AI

      Molecular modelling and AI on GPU through AI Factory — price on quote.

      Secure desktops for QA and partners

      Enterprise VDI so contract staff and auditors work without data on laptops.

      Plant OT and environment monitoring

      Sensor data via IoT Cloud and OT networks reviewed through an OT assessment.

      How XcellHost delivers

      Who validates what, on one V-model.

      Blue steps are yours, orange steps are ours, navy steps are shared. Tap a step to see the deliverable.

      —

      —

      —

      Your QA / system ownerXcellHostShared
      Plans

      GxP-ready capacity, priced like the rest of our cloud.

      Compute uses the same rates as General Compute; the dedicated cluster is priced as on Private Cloud. Validation work is separate and quoted per project.

      GxP-ready VPC

      For LIMS, QMS and DMS

      ₹599/ vCPU / month
      • ₹149 per GB RAM · ₹6 per GB NVMe a month
      • NTP sync, audit logging, PAM-ready
      • Mumbai Tier IV, DR options in India*
      • IQ / OQ pack available*
      Common for exporters GxP Dedicated Cloud

      A 3-node cluster for your validated estate

      ₹49,999/ month* · 3 nodes
      • Hardware used by you alone · +₹17,999 per node
      • Change control aligned to your QMS
      • Warm or hot DR in India*
      • Supplier audit by your QA team
      Validated Programme

      Multi-site LIMS, SAP, clinical estates

      On quotewith your QA and vendors
      • SAP from ₹49,999 / month* · as on SAP Hosting
      • Private links to plants and labs
      • GPU for R&D — price on quote
      • Named validation lead*
      ₹89,999*GxP infrastructure qualification pack (IQ / OQ of the hosting layer) · one-time · indicative
      ₹14,999*Validation support per consultant-day · indicative
      ₹2,499Managed DR · per workload / month* · as on Resilience Operations
      ₹44924×7 SOC · per server / month* · as on Security Operations
      ₹1,499PAM · per privileged account / month* · as on PAM
      ₹999 + ₹1,999Server backup / month + India storage per TB* · as on XcellBackup
      ₹24,999Cloud HSM partition for signing keys / month* · as on Cloud HSM
      ₹59,999 · ₹19,999vCISO / vDPO retainers per month* · as on vCISO & vDPO

      * Indicative — confirm with XcellHost. INR, excluding 18% GST. Prices marked "as on" are the same figures published on those XcellHost pages. Application licences (LIMS, QMS, MES, CDS, SAP), instrument interfaces and private links are quoted separately. "GxP-ready, validation support*" describes our infrastructure and services; it is not a certification.

      Configure

      Size your GxP-ready cloud. See the rupee total.

      Choose the system to load defaults, then adjust. Validation days and the qualification pack are one-time lines.

      1 · GxP system
      2 · Platform
      3 · DR tier
      —
      4 · Add-ons
      Your estimate · indicative

      GxP-ready VPC · LIMS

        Monthly₹0
        One-time₹0
        Subtotal · first invoice₹0
        GST (18%)₹0
        Total incl. GST₹0
        * Indicative — confirm with XcellHost. INR excl. 18% GST. Application licences, instrument interfaces, links and GPU are quoted separately.
        Tool · GxP hosting readiness checker

        Would your hosting pass the next supplier audit?

        Guidance only. Pick your company profile, answer ten questions, see the gaps and how we close them. Nothing leaves your browser.

        Expectations in view
          Readiness · guidance
          0%
          answer the questions
            Reflects the instruments cited on this page as checked October 2026. Confirm with your QA head and the current published texts.
            Tool · LIMS validation effort estimator

            How many test scripts, days and weeks — before you ask for a quote.

            Illustrative planning model. Adjust the system, GAMP category, requirements and risk. Compare a traditional script-everything approach with a risk-based one.

            System
            GAMP 5 software category
            Testing approach
            Effort estimate · illustrative
            Test scripts0
            Effort days0
            Calendar weeks0
              —
              Indicative validation support · excl. GST₹0—
              Model scripts = URS × (high% × 1 + low% × 0.8 traditional / 0.3 risk-based) + interfaces × 3 days = scripts × (0.5 · 0.75 · 1.25 by category) + 14 docs + interfaces × 1.5 + (sites − 1) × 4 weeks = ⌈days ÷ 8⌉ (two people) · cost = days × ₹14,999* + IQ / OQ pack ₹89,999*
              Illustrative, not a quotation. Real effort depends on your SOPs, vendor documentation and how much you leverage supplier testing. You own the validation decision.
              Compare

              Pharma cloud, generic public cloud or the plant server room?

              XcellHost Pharmaceutical CloudGeneric public cloudPlant server room
              Infrastructure qualificationIQ / OQ pack for the hosting layer*Compliance reports; you write the qualificationYou qualify every refresh
              Supplier auditYour QA audits us on site in MumbaiStandard reports; on-site audits rareNot applicable
              Change controlLinked to your QMS, GxP impact assessedProvider changes on its own scheduleYour team, often informal
              Clock sync & logsNTP everywhere, logs kept in IndiaAvailable; you configure itOften drifting, local logs
              Validation helpValidation support days* from the same teamSeparate consultantSeparate consultant
              BillingINR invoice with GSTUsage-based, often USD-linkedCapex, AMC, power, staff
              Getting started

              From supplier audit to validated go-live.

              1. 1Supplier assessmentYour QA reviews our questionnaire, policies and facility.Weeks 1–2*
              2. 2Design & quality agreementArchitecture, responsibilities, change control and SLA in writing.Weeks 2–4*
              3. 3Build & IQ / OQInfrastructure built and qualified; report handed to QA.Weeks 4–7*
              4. 4Application validationYour PQ / UAT with our support*; data migration verified.Weeks 6–12*
              5. 5ReleaseValidation summary report signed; cut-over; first restore test.Go-live*
              6. 6Operate in a validated stateChange control, periodic review, DR drills and audit support.Ongoing